Project outsourcing structural steel fabrication and erection of the production line with the industry DLH

The work done Outsourcing structural steel fabrication and erection of the production line with the industry DLH
Investor DLH INDUSTRY JOINT STOCK COMPANY
Partner DLH INDUSTRY JOINT STOCK COMPANY
The amount of work Fabrication and installation of 200 m³ silicon: 20,856 kg

Fabrication and installation of 50 m³ silo: 8,000 kg

Fabrication and installation of stone cutting funnel: 14,000 kg

Processing and installation of charcoal hopper: 7.000 kg

FABRICATION SILO & FUNNEL IN CONTRUCTION SITE

SILO & FUNNEL TO COMPLETE 

CONSTRUCTION OF THE GENERAL HYDRAT HYDRAULIC PRODUCTION SYSTEM

OVERALL ERECTION INCLINED CONVEYOR SYSTEM  AND TOP OVEN

ERECTION STRUCTURE NOT STANDARDIZATION  HYDRAT

TOTAL PROJECT AFTER COMPLETION